Rendering of Building 2
/2000.00
0 % Funded
About the project
Our Phase 2 building has had some damage caused by the rain in conjunction with some guttering that was not up to the job. Also the local bricks that are used in Uganda do not have the same longevity as what we expect from bricks made in the UK as they are made from different local materials. Together this has led to damage and deterioration to the external brickwork of the building. Although the guttering has been fixed the damage still remains and is likely to get worse as we see more rainfall over the coming years.